| Bridge Name: |
Route 10 and Route 605 Interchange
|
| Location: |
Cerritos, California
|
| Description: |
The project encompassed the seismic retrofit of four bridge structures. Retrofit schemes constructed included full height column casings, approach slab replacement, abutment retrofit consisting of new wing walls and tie rods, and footing retrofit.
|
| SCOPE: |
|
| Cost: |
$700,000
|
| Owner: |
Caltrans
|
| References: |
Mr. Rudy Chong, Caltrans 1299 E. Artesia Boulevard, Suite 200 Los Angeles, CA 90476 Tel: (310) 609-0268
|
| End Date: |
1999
|
|