Bridge Name: O’Donovan Road Bridge at Huero Creek & Upper Los Berros Creek Bridge at Los Berros Creek
Location: San Luis Obispo, California

Description: Provided comprehensive construction management for two bridges for the County of San Luis Obispo. The services encompassed pre-construction phase in the set up of the project, construction management and the post-construction phase to resolve claims resolution and the preparation of the as-built plans.

O'Donovan Road Bridge at Huero Creek:
The existing bridge at this location was replaced by a new four span reinforced concrete slab bridge with pier walls supported on 70 ton HP10X57 steel driven piles. Included in this effort was the construction of the detour for O Donovan Road, removal of the existing concrete dip structure, construction of the approaches and rock slope protection. The estimated construction cost for the bridge was approximately $570,000 and the construction working days were approximately 95 working days.

Upper Los Berros Creek Bridge at Los Berros Creek:

Corbel:
A new single span reinforced concrete slab bridge replaced the existing bridge at Los Berros Creek on the Upper Los Berros Road near Nipomo. This included the construction of a detour for Los Berros Road that entails the building of a temporary CSP culvert, removal of the existing bridge and the roadway approach. The existing rock slope protection and rock rubble abutments remained in place. The estimated construction cost was approximately $173,000 and the project was completed in approximately 50 working days.
Key Issues were:
Preparation and Maintenance of the project file per Caltrans & County Standards.
Environmental Compliance/Water Pollution Prevention.
Pile Driving and compliance with AWS if piles are supplied.
Traffic Control during Detour and Final Stages
Protection of historic rock walls and rock rubble abutment during removal at Los Berros Creek Bridge.
Review of Falsework


Scope: Construction Management Services

Cost: $843,000

Owner: County of San Luis Obispo

Reference: Mr. Dave O’Halloran, PE
County of San Luis Obispo
County Government Center
San Luis Obispo, CA 93408
Tel: (805) 781-4387

End Date: 1996

Project Categories
Bridge Design
Seismic Bridge Design
Bridge Construction
NBIS Bridge Inspection


Bridge Design Experience

Bridge Design Experience


Bridge Construction Experience

Bridge Construction Experience