Bridge Name: Route 5/126 Separation (Magic Mountain).

Location: Santa Clarita, California

Description: The project features include (1) Replacing the existing twin 4 span tee beam bridge with a 4 span precast I-girder (2) Demolishing existing twin bridges, Bridge Nos. 53-1625 R/L (3) Modifying I-5/ 126 Separation Interchange with an improved diamond interchange

SCOPE: Athalye Consulting Engineers was responsible for the for the PS&E preparation for the bridge replacement of the existing 4 span structure with a single wider bridge to accommodate eight lanes of traffic and a closed median. Included in this effort was the preparation of the Type Selection Report. Unique aspects include design of temporary bridge for stage construction, traffic handling and relocation and addition of numerous non-standard architectural features consistent with Caltrans safety and functional requirements. Site specific seismic criteria conforming to Caltrans SDC Version 1.1 was utilized in completing this fast track project. The CISS pile shafts were designed to account for down drag forces associated with liquefaction. The project was completed under a stringent accelerated time schedule.

Cost: $4,500,000 ( Bridge Cost)

Owner: Caltrans

References: Ms. Patty McCauley
Caltrans
1801-30th Street, MS9-2/7G
Sacramento, CA 95816
Tel: (916) 227-8772
Cell: (916) 715-9845

End Date: November 2000

Project Categories
Bridge Design
Seismic Bridge Design
Bridge Construction
NBIS Bridge Inspection


Bridge Design Experience

Bridge Design Experience


Bridge Construction Experience

Bridge Construction Experience